PGNiG books more regasification capacity at Swinoujscie terminal
Published by Lydia Woellwarth,
Editor
LNG Industry,
Starting from 2024, Polish Oil and Gas Company (PGNiG) will be able to import 8.3 billion m3/y of natural gas after regasification via the President Lech Kaczynski LNG Terminal in Swinoujscie following completion of a booking procedure for the regasification capacity that will be available to importers once the terminal has been extended.
To read the full article
"PGNiG books more regasification capacity at Swinoujscie terminal"
Please sign in or register for FREE
Sign in »
Register for free »
Get started absolutely FREE in 2 minutes, plus receive a free printed magazine.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/26052020/pgnig-books-more-regasification-capacity-at-winoujcie-terminal/
You might also like
Crown LNG selects IKM Consulting Ltd as engineering design partner for Grangemouth LNG project
Crown LNG Holdings Ltd has selected IKM Engineering & Environmental Consultants as its partner for the design and engineering of its planned 100% owned floating LNG import terminal in the Firth of Forth, Scotland.