OLT Offshore LNG Toscana launches tender for peak shaving service
                            
                                
                                
                                        
                                            
                                        
                                
                                    
                                        Published by David Rowlands,
                                        Editor
                                        
                                    
                                LNG Industry,
                                
                            
                        
From 2 – 16 October 2018, it will be possible to download all the documents necessary to take part in the public tender procedure from the company’s website. The winner of the tender will need to supply an LNG cargo to be discharged at OLT terminal between 1 November 2018 and 31 December 2018.
The peak shaving service is one of the emergency measures established by the Decree of the Ministry of the Economic Development within the ‘Emergency Plan’ to face unfavourable events for the national gas system, which may occur during the winter period of the gas year 2018/2019, and to guarantee the security of the Italian gas system. In case of emergency, this system would allow (from 1 January – 31 March 2019) gas to be inserted into the network – previously unloaded and stocked into the tanks of the terminal – at short notice, with the aim of facing peak requests of the gas system for a limited period of time.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/08102018/olt-offshore-lng-toscana-launches-tender-for-peak-shaving-service/
You might also like
Clean Energy Fuels signs new supply agreements
Clean Energy Fuels Corp. has announced a series of new agreements with customers across the US expanding their use of renewable natural gas and LNG.
 
                                