Skip to main content

BV to grant Gas-Prepared notation to six Suezmax tankers

Published by , Editor
LNG Industry,


Bureau Veritas (BV) has announced that it will grant Gas-Prepared notation to six Suezmax tankers that are being built for Dynacom Tankers Management. The 157 000 dwt tankers will be 274.3 m long, have a beam of 48 m and a depth of 23.2 m. They are under construction at New Times Shipbuilding in China, and are expected to be delivered in 2017 and 2018.

The Gas-Prepared notation sets out the requirements for vessels that are designed and fitted for dual-fuel or LNG propulsion, but are not originally intended to use gas as fuel. This provides owners with the option to convert to either dual-fuel or LNG propulsion at a later date.

Jean-François Segretain, Marine & Offshore Technical Director, Bureau Veritas said: “Using natural gas as fuel enables owners to comply with the requirements of Emission Control Areas (ECAs) in North America and Europe, and can be cost-effective in the long-term. In publishing the Gas-Prepared notation, Bureau Veritas sought to provide owners with the ability to switch to LNG in the future when market conditions are right.

“Applying for Gas-Prepared is an important step in future-proofing a new vessel and we look forward to working with Dynacom, the first owner in the market to choose this solution.”

Published in late 2015, BV’s Rule Note NR 627 Gas-Prepared Ships sets out how the vessel’s initial design is to take into account the necessary spaces or zones to accommodate the following installations:

  • LNG bunkering station.
  • LNG storage tanks.
  • Fuel gas handling system.
  • Ventilation systems.
  • GVU.
  • GCU, where required by NR529.
  • Vent mast.

The notation Gas-Prepared is awarded to vessels that meet the standards. The notation may be modified with the addition of the following:

  • S – when specific arrangements are implemented for the ship structure.
  • P – when specific arrangements are implemented for piping.
  • ME-DF – when the main engine is dual-fuel.
  • AEB – when the auxiliary engines and oil-fired boilers are either dual-fuel, or designed for future conversion to dual-fuel operation.

Edited from press release by David Rowlands

Read the article online at: https://www.lngindustry.com/liquid-natural-gas/08092016/bv-to-grant-gas-prepared-notation-to-six-suezmax-tankers-3022/

You might also like

Securing LNG’s leading role on the global energy stage

In our recent April issue of LNG Industry, Michael Pospisil P.E., Senior Engineer, and Rich Insull, P.E., Project Manager, Matrix PDM Engineering, detail the significance of life cycle analysis to helping secure LNG’s role in the future energy mix.

 
 

Embed article link: (copy the HTML code below):