Revamp gives compressor new life
The very first Laby®-GI Compressor of Burckhardt Compression was used as a minimum send-out compressor.
The very first Laby®-GI Compressor of Burckhardt Compression was used as a minimum send-out compressor.
Exmar has executed a 10 year charter with Gunvor for its FSRU barge.
Smit Lamnalco has secured a 20-year contract with the National Oil and Gas Authority of Bahrain to supply marine services to the Bahrain LNG terminal.
In 2017 Jumbo was awarded a contract by Geocean for the Moheshkhali Project.
TMC has signed two contracts to supply a total of five marine compressors to a floating storage regasifaction unit that Hyundai Heavy Industries is building for Swan Energy Ltd.
A clean, reliable power supply is critical for offshore oil and gas assets.
LNG terminal at Jaigarh Port to enable development of local port-based industries.
Black & Veatch’s PRICO® technology is set to play a major role in BP’s field development in West Africa.
Coalition says uptake of LNG as a marine fuel can play a significant role in decarbonising the shipping industry.
Golar LNG has entered into a Preliminary Agreement and exchanged Heads of Terms with BP Mauritania Investments for an FLNG vessel.
The Merakes field, estimated to hold about 2 trillion ft3 of lean gas in place, is located in 1500 m water depth offshore East Kalimantan, Indonesia.
The long-delayed Browse gas project off Western Australia has gained key support.
Croatia will announce on 28 May the results of a tender to use capacity at a planned LNG terminal in the northern Adriatic.
A planned LNG terminal on the island of Krk in the northern Adriatic meets environmental requirements.
TechnipFMC has been awarded a front-end engineering design contract by BP for the FPSO unit for the Tortue/Ahmeyim Field Development.