Skip to main content

LNG storage tanks unloaded at the Talleyrand Terminal

Published by
LNG Industry,


JAXPORT recently announced that two 260 t LNG storage tanks have been fastened onto their foundations at Crowley Maritime Corp.’s new shore-side fuelling facility at the Talleyrand Marine Terminal in Jacksonville, Florida, US.

The authority has also released a video of the event, which can be viewed below.

Read the article online at: https://www.lngindustry.com/small-scale-lng/05042017/lng-storage-tanks-unloaded-at-the-talleyrand-terminal/

You might also like

ABL wins new Woodside contract on Scarborough

Woodside has appointed ABL Group to provide marine warranty services (MWS) for construction, transportation, and installation work on the Scarborough Project in offshore Western Australia.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

US LNG news LNG bunkering news