GTT to design FSRU for MOL
Published by Will Owen,
Editor
LNG Industry,
GTT has received an order from the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) for the design of a new floating storage and regasification unit (FSRU) on behalf of the Japanese ship-owner Mitsui OSK Lines Ltd. (MOL).
The FSRU with a capacity of 263 000 m3 will be fitted with the NO96 membrane cryogenic containment system, a technology developed by GTT. The vessel delivery is scheduled in 2023. It will be located in Wilhelmshaven, Germany.
Philippe Berterottière, Chairman and CEO of GTT, said: “We are delighted to be working with DSME and MOL, two very long-term partners, on this new very large capacity FSRU project.”
Read the article online at: https://www.lngindustry.com/regasification/10062020/gtt-to-design-fsru-for-mol/
You might also like
EIA: US natural gas trade will continue to grow with the start-up of new LNG export projects
The U.S. Energy Information Administration’s recently released Short-Term Energy Outlook forecasts that US LNG exports will continue to lead growth in US natural gas trade as three LNG export projects currently under construction start operations and ramp up to full production by the end of 2025.