Skip to main content

GTT receives order for tank design of three new LNG carriers

Published by , Editor
LNG Industry,


GTT has received an order from its partner, Dalian Shipbuilding Industry Co. Ltd, for the tank design of three new LNG carriers, on behalf of China Energy.

GTT will design the tanks of these three vessels, which will each offer a capacity of 175 000 m3. The tanks will be fitted with the Mark III Flex membrane containment system developed by GTT.

The delivery of the vessels is scheduled for 1H27 and 1Q28.

Read the article online at: https://www.lngindustry.com/lng-shipping/21092023/gtt-receives-order-for-tank-design-of-three-new-lng-carriers/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

LNG carrier news Natural gas news