GTT receives tank design order for two new LNG carriers
Published by David Rowlands,
Editor
LNG Industry,
The 174 000 m3 vessels will be constructed on behalf of the Greek shipowner Consolidated Marine Management (CMM). They are scheduled for delivery between 1Q21 and 3Q21.
GTT claims that the LNG tanks will be equipped with the Mark III Flex containment system.
The Chairman and CEO of GTT, Philippe Berterottière, said: “We are pleased with the long-term partnership of excellence developed with HSHI, and to accompany Consolidated Marine Management for its entry in the LNG world.”
Read the article online at: https://www.lngindustry.com/lng-shipping/14122018/gtt-receives-tank-design-order-for-two-new-lng-carriers/
You might also like
Crown LNG selects IKM Consulting Ltd as engineering design partner for Grangemouth LNG project
Crown LNG Holdings Ltd has selected IKM Engineering & Environmental Consultants as its partner for the design and engineering of its planned 100% owned floating LNG import terminal in the Firth of Forth, Scotland.