GTT receives order for the tank design of two LNG carriers
Published by David Rowlands,
Editor
LNG Industry,
The order was reportedly received on behalf of a European shipowner. According to the statement, the delivery of the ships is scheduled for the first semester of 2021.
GTT claims that its membrane containment system Mark III Flex has been selected for the design of the tanks.
The names of the shipowner and shipyard are confidential.
Read the article online at: https://www.lngindustry.com/lng-shipping/11122018/gtt-receives-order-for-the-tank-design-of-two-lng-carriers/
You might also like
EIA: US natural gas trade will continue to grow with the start-up of new LNG export projects
The U.S. Energy Information Administration’s recently released Short-Term Energy Outlook forecasts that US LNG exports will continue to lead growth in US natural gas trade as three LNG export projects currently under construction start operations and ramp up to full production by the end of 2025.