OTD completes commissioning of BWTS system for Avenir LNG carrier
Published by Will Owen,
Editor
LNG Industry,
Offshore Technology Development (OTD) has completed the commissioning of its latest ballast water treatment system (BWTS) new-build project.
The BWTS was installed on a 7500 m3 LNG carrier with bunkering capability, currently being built by Keppel Offshore & Marine for Avenir LNG, at the Keppel Nantong Shipyard in China.
OTD’s job scope included equipment supply and commissioning of the BWTS.
Notwithstanding the impact of COVID-19, OTD completed the job safely by utilising local resources in China with close supervision from OTD remotely in Singapore.
Read the article online at: https://www.lngindustry.com/lng-shipping/08062020/otd-completes-commissioning-of-bwts-system-for-avenir-lng-carrier/
You might also like
EIA: US natural gas trade will continue to grow with the start-up of new LNG export projects
The U.S. Energy Information Administration’s recently released Short-Term Energy Outlook forecasts that US LNG exports will continue to lead growth in US natural gas trade as three LNG export projects currently under construction start operations and ramp up to full production by the end of 2025.