OTD completes commissioning of BWTS system for Avenir LNG carrier
Published by Will Owen,
Editor
LNG Industry,
Offshore Technology Development (OTD) has completed the commissioning of its latest ballast water treatment system (BWTS) new-build project.
The BWTS was installed on a 7500 m3 LNG carrier with bunkering capability, currently being built by Keppel Offshore & Marine for Avenir LNG, at the Keppel Nantong Shipyard in China.
OTD’s job scope included equipment supply and commissioning of the BWTS.
Notwithstanding the impact of COVID-19, OTD completed the job safely by utilising local resources in China with close supervision from OTD remotely in Singapore.
Read the article online at: https://www.lngindustry.com/lng-shipping/08062020/otd-completes-commissioning-of-bwts-system-for-avenir-lng-carrier/
You might also like
GTT receives order from Hanwha Ocean for carrier tank designs
GTT has received an order from Hanwha Ocean for the tank design of two new LNG carriers for the US market.