Keel-laying ceremony held for Russia’s first LNG-fuelled passenger vessel
Published by David Rowlands,
Editor
LNG Industry,
The ceremony was held at the shipyard of the Zelenodolsk Plant in Tatarstan. Chaika LNG is a leisure and sightseeing boat, and is intended for passenger voyages, including via tourist routes. It can accommodate at least 170 people, and is expected to be launched as early as this year.
According to the statement, there are plans for the region to introduce several more LNG-powered tourist vessels, which Gazprom will be responsible for refuelling.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/28022020/keel-laying-ceremony-held-for-russias-first-lng-fuelled-passenger-vessel/
You might also like
Measuring the LNG process with confidence
At every stage of the LNG process – from pretreatment to transportation – accurate and reliable measurements are essential for optimising production, maintaining safety, and ensuring profitability.