Skip to main content

Novatek ship first LNG cargo to Brazil

Published by , Editor
LNG Industry,


Pao Novatek has announced that its wholly owned subsidiary, Novatek Gas and Power Asia Pte. Ltd., has shipped its first LNG cargo to the Brazilian market with LNG produced from the Yamal LNG project.

The cargo was delivered to the Bahia Regasification Terminal owned by Petrobras.

“Our LNG marketing strategy aims to diversify our supply geography and customer base,” noted Leonid Mikhelson, Novatek’s Chairman of the Management Board. “This shipment represents our first LNG cargo produced by our own production to the Latin American market, and confirms the viability of our logistical model and unique geographical location of the Yamal LNG project to deliver competitively priced LNG to any part of the world.”

Read the article online at: https://www.lngindustry.com/liquid-natural-gas/24092018/novatek-ship-first-lng-cargo-to-brazil/

You might also like

Keep liquefaction running smoothly with Panametrics

Accurate flow rate measurement during LNG liquefaction is essential. But how do you know if your flow meter can handle potential pressure drops, temperature changes, and the extreme conditions of the cryogenic process? Download Panametrics’ new case study to learn how its flow meters can deliver extremely accurate LNG flow measurements.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

LNG export news LNG import news