ClassNK opens new survey office in Bahrain
Published by David Rowlands,
Editor
LNG Industry,
ClassNK has announced that it has opened a new survey office in Bahrain, with operations to commence on 15 March 2016. The main ship repair yard in the Middle East is located in Bahrain and the Khalifa bin Salman Port (KBSP) is becoming a significant regional trans-shipment centre since its opening in 2009.
ClassNK claims that, through opening this new office, it will improve the efficiency of Persian gulf region ship surveys.
This follows the announcement made earlier in March 2016 that ClassNK appointed Koichi Fujiwara as its new Chairman and President.
Edited from press release by David Rowlands
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/15032016/classnk-opens-new-survey-office-in-bahrain-2126/
You might also like
Reliable Processing Power – The 27 MW MRC from Atlas Copco Gas and Process
The 27 MW MRC from Atlas Copco Gas and Process is designed to achieve 99.8% reliability and 84% overall compressor efficiency. The 27 MW MRC is the world’s largest integrally geared MRC, with the smallest footprint.