AB Klaipedos Nafta release results for November 2017
Published by Will Owen,
Editor
LNG Industry,
In November 2017 the company’s LNG terminal re-gasified and supplied 1.64 million MWh of natural gas to the natural gas transmission system, compared to November 2016 – 911 000 MWh.
During the first eleven months of 2017 the company’s total re-gasification and reloading was 13.3 million MWh of natural gas (during the same period of 2016 – 13.8 million MWh).
The preliminary sales revenues of the company’s LNG Terminal for November 2017 comprise €5.6 million (November 2016 – €5.5 million). These revenues comprise from the part of security supplement dedicated for compensation of LNG terminal exploitation expenses, as well as regasification and reloading tariffs. The preliminary revenues of the LNG terminal for the first eleven months of 2017 comprise €62.8 million and increased by 2.1% compared to the same period of 2016 (€61.5 million).
Total preliminary sales revenues of the company for the first eleven months of 2017 comprise €96.5 million – i.e. 0.7% higher compared to same period 2016 (€95.8 million).
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/11122017/ab-klaipedos-nafta-release-results-for-november-2017/
You might also like
CMA CGM LNG dual-fuel container ship delivered at Hudong-Zhonghua shipyard
Bureau Veritas Marine & Offshore has announced the delivery of the CMA CGM SEINE, a new 24 000 TEU LNG dual-fuel container ship, by Hudong-Zhonghua Shipbuilding.