GTT to equip Höegh FSRU with containment system
Published by David Rowlands,
Editor
LNG Industry,
GTT claims that the order includes three optional FSRUs. All of the vessels will be constructed at SHI’s shipyard in South Korea on behalf of Höegh LNG Holdings Ltd. The first vessel is scheduled for delivery in May 2019.
Each FSRU will have a regasification capacity of 750 million ft3/d and a storage capacity of 170 000 m3.
Philippe Berterottière, Chairman and CEO of GTT, said: “We are very satisfied that our systems have become the standard in this offshore gas industry segment. GTT benefits from a renowned expertise in this market and the company is quite confident in its capability to meet new challenges.”
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/07022017/gtt-to-equip-hegh-fsru-with-containment-system/
You might also like
CB&I awarded contract by TotalEnergies and OQ for full containment LNG tank
CB&I has been awarded a contract by Marsa Liquefied Natural Gas LLC, a joint venture between TotalEnergies and OQ, for the EPC of a full containment concrete LNG storage tank, located in Oman's Port of Sohar.