Skip to main content

LNG-powered research vessel to utilise Kongsberg solution

Published by
LNG Industry,


Kongsberg has announced that it has signed a contract with German shipbuilder Fassmer for the delivery of a unique technical solution for the German Federal Maritime and Hydrographic Agency (BSH) research vessel, Atair II.

The vessel will be the first government-owned, LNG-powered research vessel in the world. It will also be the first newbuild to utilise Kongsberg’s Integrated Research Vessel Concept, which the company claims will unite operational hydrographic and energy functions on board, facilitating seamless information sharing, improved efficiency and long-term lifecycle benefits.

Kongsberg’s Integrated Vessel Concept for research vessels provides a fully integrated operator environment, featuring high level acoustic data acquisition dynamic positioning, propulsion control, navigation and vessel automation. The concept provides the tools required to help meet research goals, combined with flexible, intelligent energy management and propulsion solutions. Alongside its sub suppliers, Kongsberg will provide all of the electrical systems, telecom systems, the propulsion motor, cables and installation as a full engineering, procurement, construction and installation (EPCI) contract.

Brynjulv Standal, VP Global Sales & Marketing, Kongsberg Maritime, said: “KONGSBERG Integrated Vessel Concepts are a brand-new approach to vessel design and building that leverage the power of integration between disparate systems to produce gains in operational efficiency and reduced lifecycle costs across the board. With concepts designed for specific ship types, our Integrated Vessel Concepts portfolio represents the cutting-edge of marine technology and engineering. We are delighted to work with BSH and Fassmer Werft to bring true integration to the new Atair.”

Fassmer Werft will construct Atair II in Berne. Upon completion, it will be the largest vessel in BHS’ fleet, and will operate in the North Sea and Baltic Sea. It will carry out hydrographic surveys and search and rescue operations, in addition to marine environmental monitoring, and the technical testing of navigation and radar equipment. It is scheduled for delivery in 2020.

Read the article online at: https://www.lngindustry.com/liquid-natural-gas/04052017/lng-powered-research-vessel-to-utilise-kongsberg-solution/

You might also like

 InEight

[WEBINAR] Why Risk-Adjusted Project Forecasting Is Becoming the New Norm

This webinar will walk the audience through a methodology for developing risk-adjusted plans, leveraging remote collaboration techniques for disparate and socially distanced teams. This next-generation risk management approach is already proving itself on numerous oil and gas CAPEX projects. Find out why InEight expects the trend of risk-adjusted scheduling adoption to continue. Register for free today »

 

Polyisocyanurate vs. cellular glass

Johns Mansville looks at the differences between polyisocyanurate (PIR) and cellular glass insulations and discusses which one is better for LNG pipe insulation applications.

 
 

Embed article link: (copy the HTML code below):