Gazprom to add a fourth LNG train to Sakhalin II LNG plant?
Published by David Rowlands,
Editor
LNG Industry,
According to Reuters, Gazprom is currently considering whether or not to build a fourth LNG production train for its joint venture (JV) with Shell – The Pacific Sakhalin II LNG plant. Reportedly, Alexander Medvedev, the Deputy CEO of Gazprom, said that Gazprom was still interested in investing in LNG projects, such as Sakhalin II and Baltic LNG, despite the fact that oil prices are currently relatively low (approximately US$45 – US$50/bbl).
In an interview with Reuters, Medvedev said: “From a technical point of view everything (that is needed for the fourth production train) is there.”
Edited from various sources by David Rowlands
Read the article online at: https://www.lngindustry.com/liquefaction/29092015/gazprom-to-add-a-fourth-lng-train-to-sakhalin-ii-1377/
You might also like
HAM Italia inaugurate first LNG-CNG refuelling station in Italy
HAM Italia and the HAM Group have inaugurated the first EDUX LNG-CNG refuel-ling station in Italy, located in Via del Camposanto.