TechnipFMC wins contract for the Coral South FLNG project
Published by David Rowlands,
Editor
LNG Industry,
Coral FLNG SA is special purpose entity incorporated in Mozambique, owner of the FLNG facility and jointly owned by Eni Mozambique LNG Holding B.V., CNODC Mozambique B.V., ENH FLNG UM, SA, Galp Energia Rovuma B.V. and KG Mozambique Ltd.
The facility will be capable of producing nearly 3.4 million tpy of LNG, and will be moored in 2000 m of water in the Area 4, offshore Mozambique.
The CEO of TechnipFMC, Doug Pferdehirt, said: “We are honoured to be the leader of the execution of this prestigious contract awarded by Eni and its partners to the TJS consortium. Combining TechnipFMC’s unique capabilities in both FLNG and subsea, we have been able to propose to our client an optimum combination, demonstrating the strength of our integrated offerings.”
The President of TechnipFMC’s Onshore/Offshore business, Nello Uccelletti, added: “This FLNG award is a key milestone for TechnipFMC and confirms our pioneering and leading position on the floating LNG market.”
Read the article online at: https://www.lngindustry.com/liquefaction/02062017/technipfmc-wins-contract-for-the-coral-south-flng-project/
You might also like
EIA: US natural gas trade will continue to grow with the start-up of new LNG export projects
The U.S. Energy Information Administration’s recently released Short-Term Energy Outlook forecasts that US LNG exports will continue to lead growth in US natural gas trade as three LNG export projects currently under construction start operations and ramp up to full production by the end of 2025.