Skip to main content

New Fortress Energy announces closing of loan for second FLNG unit

Published by , Editor
LNG Industry,


New Fortress Energy Inc. has announced that after producing LNG at its first floating LNG unit (FLNG 1), the company has closed its previously announced US$700 million loan for its second FLNG unit (FLNG 2). Now operational, FLNG 1 expects to deliver its first cargo in August and enter full production thereafter.

The new loan will fully fund the construction of FLNG 2. FLNG 2 will be developed in partnership with Comisión Federal de Electricidad (CFE) utilising its extensive in-place terminal infrastructure onshore in Altamira, Mexico. The new liquefaction unit will incorporate the same proprietary modular technology as FLNG 1 and is expected to complete construction in 1H26.

“Our FLNG complex is advancing at a rapid pace as we have now produced LNG at our first unit, and fully financed our second. These are large infrastructure projects that add considerable financial and operational value to our Company and we are thrilled with the progress to date,” said Wes Edens, Chairman and CEO of New Fortress Energy.

Read the article online at: https://www.lngindustry.com/floating-lng/31072024/new-fortress-energy-announces-closing-of-loan-for-second-flng-unit/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

LNG project news Natural gas news South America LNG news