Skip to main content

Video: installation of subsea structures for Shell’s Prelude FLNG vessel

Published by
LNG Industry,


Shell has released a video showing the undersea installation of the anchor piles, christmas trees and manifolds for the Prelude floating LNG (FLNG) vessel. The video can be viewed below.

The installation was completed in 21 days, which was eight days ahead of schedule. There were no incidents during the operation.

Edited from various sources by David Rowlands

Read the article online at: https://www.lngindustry.com/floating-lng/13042016/video-installation-of-subsea-structures-for-shells-prelude-flng-vessel-2278/

You might also like

 CryoTech 2020

CyroTech 2020

Professionals in the LNG sector can tune in from anywhere in the world and learn about the cutting-edge technology and the latest innovations in cryogenics – a fundamental component of the industry.

Register for your free space today »

 
 
 

Embed article link: (copy the HTML code below):