GTT to design tanks for LNG carriers
Published by Sarah Smith,
Assistant Editor
LNG Industry,
GTT announces that it has received an order from its partner, the Chinese shipyard Hudong-Zhonghua Shipbuilding (Group) Co. Ltd, for the tank design of six new LNG carriers.
GTT will design the tanks of these six LNG carriers, with a total LNG tank capacity of 174 000 m3 per ship. Each tank will be fitted with the GTT’s membrane containment system.
The delivery of these six vessels will take place between 4Q24 and the 3Q26.
Read the article online at: https://www.lngindustry.com/special-reports/10022022/gtt-to-design-tanks-for-lng-carriers/
You might also like
OMV and Cheniere sign long-term LNG supply agreement
OMV has announced the signing of a long-term sale and purchase agreement with Cheniere Energy, Inc., covering the supply of up to 850 000 tpy of LNG beginning in late 2029.