PitPoint LNG bunker station tank filled for first time
Published by Will Owen,
Editor
LNG Industry,
PitPoint’s LNG bunker station tank (200 m3 capacity) has been successfully filled with LNG for the first time by its partner Prima LNG.
The bunker station is currently being constructed along the busiest waterway in Europe, the Rhine, in the port of Cologne (Am Molenkopf 17). It marks an important step towards making LNG available for inland shipping as a clean fuel option.
Read the article online at: https://www.lngindustry.com/small-scale-lng/21082019/pitpoint-lng-bunker-station-tank-filled-for-first-time/
You might also like
EIA: US natural gas trade will continue to grow with the start-up of new LNG export projects
The U.S. Energy Information Administration’s recently released Short-Term Energy Outlook forecasts that US LNG exports will continue to lead growth in US natural gas trade as three LNG export projects currently under construction start operations and ramp up to full production by the end of 2025.