Skip to main content

Dunkirk LNG terminal physically connected to the French gas network

Published by , Editor
LNG Industry,


GRTgaz has announced that the Dunkirk LNG terminal has been physically connected to the French transmission network.

The Dunkirk LNG terminal is scheduled to receive its first test LNG cargo in early 2016.

The pipeline has a diameter of 0.9 m, so, if operating at the full capacity of 1.9 million m3/hr (or 520 GWh/d), the terminal will be capable of serving 20% of French and Belgian natural gas demand.

Edited from press release by David Rowlands

Read the article online at: https://www.lngindustry.com/regasification/23112015/dunkirk-lng-terminal-physically-connected-to-the-french-gas-network-1664/

You might also like


 

 The LNG Industry Podcast

A podcast series for professionals in the LNG industry featuring short, insightful interviews. Subscribe on your favourite podcast app to start listening today.

Apple Podcasts  Spotify Podcasts  YouTube

 

 
 

Embed article link: (copy the HTML code below):