GTT to equip FSRU with Mark III containment system
                            
                                
                                
                                        
                                            
                                        
                                
                                    
                                        Published by David Rowlands,
                                        Editor
                                        
                                    
                                LNG Industry,
                                
                            
                        
The order includes one firm vessel and one optional vessel. The 170 000 m3 FSRU will be constructed in Ulsan, South Korea, at HHI’s shipyard on behalf of a European shipowner. The vessel is scheduled for delivery in March 2019, and will also feature a dual-fuel diesel engine motorisation.
Philippe Berterottière, Chairman and CEO of GTT, said: “GTT notes that the performance of its technologies for the FSRU market are renowned and appreciated by the key players of the offshore industry.
“HHI is a long term partner, we are both involved to make the maritime industry progress by providing safe and flexible solutions.”
Read the article online at: https://www.lngindustry.com/regasification/21022017/gtt-to-equip-fsru-with-mark-iii-containment-system/
You might also like
Daphne Technology and Maran Gas conclude methane abatement pilot
Daphne Technology and Maran Gas have concluded the first shipboard plasma-catalytic methane abatement pilot.