TMC to provide marine compressed air system for BW LNG FSRU
Published by David Rowlands,
Editor
LNG Industry,
The scope of work under the contract will include engineering, manufacturing and a supply of a complete compressed air system for the FSRU, which DSME is building for BW LNG. The vessel is currently under construction at the Okpo shipyard in South Korea, with an expected delivery date of November 2019.
Under the contract, TMC will provide 3 x 40 kW frequency controlled control air compressors and 3 x40 kW service air compressors.
Per Kjellin, the Managing Director of TMC, said: “Any FRSU is a vital component in the LNG value chain. That is why DMSE and BW LNG have opted for compressors that are built especially for marine application, as continuous uptime is crucial for both the on board compressor system and the vessel as a whole.”
Read the article online at: https://www.lngindustry.com/regasification/10042017/tmc-to-provide-marine-compressed-air-system-for-bw-lng-fsru/
You might also like
INOXCVA's mini LNG terminals: A modular, scalable, reliable, safe, and cost-efficient LNG distribution solution for remote locations and islands.
INOXCVA’s mini LNG terminals offer a modular, scalable, and cost-efficient solution for delivering clean energy to remote regions and islands. With rapid deployment, low CAPEX, and multi-sector utility, they enable LNG-based power, industrial fuel, and mobility where traditional infrastructure is unviable – bridging the last-mile gap in energy access.