Skip to main content

Video: working on Dunkirk LNG terminal

Published by , Senior Editor
LNG Industry,


Micaela Piras, Civil Engineer, Techint Engineering and Construction, talks about her experience, which has led her to be a Mechanical Quantity Surveyor at the Dunkirk LNG Terminal construction site.

Ms Piras explains that flexibility, determination and precision are essential elements for her job.

The Dunkirk LNG terminal will have an annual regasification capacity of 13 billion m3 of gas.

As an LNG regasification infrastructure, the Dunkerque LNG terminal will be able to accommodate the world's largest LNG tankers in France, at the western outer harbour.


Edited by

Read the article online at: https://www.lngindustry.com/regasification/10022015/video-working-on-dunkirk-lng-terminal-145/

You might also like

 
 

Embed article link: (copy the HTML code below):