Video: working on Dunkirk LNG terminal
Published by Callum O'Reilly,
Senior Editor
LNG Industry,
Micaela Piras, Civil Engineer, Techint Engineering and Construction, talks about her experience, which has led her to be a Mechanical Quantity Surveyor at the Dunkirk LNG Terminal construction site.
Ms Piras explains that flexibility, determination and precision are essential elements for her job.
The Dunkirk LNG terminal will have an annual regasification capacity of 13 billion m3 of gas.
As an LNG regasification infrastructure, the Dunkerque LNG terminal will be able to accommodate the world's largest LNG tankers in France, at the western outer harbour.
Edited by Callum O'Reilly
Read the article online at: https://www.lngindustry.com/regasification/10022015/video-working-on-dunkirk-lng-terminal-145/
You might also like
HAM Italia inaugurate first LNG-CNG refuelling station in Italy
HAM Italia and the HAM Group have inaugurated the first EDUX LNG-CNG refuel-ling station in Italy, located in Via del Camposanto.