Klaipedos Nafta releases July 2015 regas figures
Published by Callum O'Reilly,
Senior Editor
LNG Industry,
SC Klaipedos Nafta’s LNG terminal regasified 326 000 MWh of natural gas during July 2015. The natural gas was supplied to the country’s natural gas transmission system.
The preliminary sales revenues of the company’s LNG Terminal for July 2015 was €5.4 million, which is equal to the one-twelfth of the sum of necessary LNG terminal operation costs and return on investments into LNG terminal infrastructure for 2015, approved by the National Commission for Energy Control and Prices.
SC Klaipedos Nafta’s total preliminary revenue revenues for the first seven months of 2015 stood at €62.4 million, compared to €19.4 million in the corresponding period of last year.
Edited from press release by Callum O'Reilly
Read the article online at: https://www.lngindustry.com/regasification/06082015/klaipedos-nafta-releases-july-2015-regas-figures-1108/
You might also like
Wood Mackenzie: US LNG full lifecycle emissions delivered to Europe are 48% of the coal equivalent
Wood Mackenzie has used its proprietary data as well as credible third-party sources to prepare a rigorous comparison of lifecycle emissions of US LNG and coal in power generation.