Skip to main content

GTT receives LNG carrier orders from Hyundai group

Published by , Editor
LNG Industry,


GTT has received two new orders from the Hyundai group concerning the tank design of two LNG carriers.

The first vessel offers a capacity of 180 00 m3, and the second offers 174 000 m3.

The orders have been placed on behalf of two ship-owners whose names remain confidential at this stage.

The two LNG carriers will be built in Hyundai Heavy Industries (HHI) and Hyundai Samho Heavy Industries (HSHI) shipyards in Korea.

GTT’s Mark III Flex membrane containment system has been selected to equip the tanks of the vessels, the deliveries of which are scheduled between 4Q21 and 1Q22.

Read the article online at: https://www.lngindustry.com/lng-shipping/23072019/gtt-receives-lng-carrier-orders-from-hyundai-group/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

LNG carrier news