GTT receives order for new LNG carrier
Published by Callum O'Reilly,
Senior Editor
LNG Industry,
GTT has announced that it has received a new order for an LNG carrier to be built by Daewoo Shipbuilding & Marine Engineering (DSME). It is expected that the new LNG carrier will be delivered in 2018.
The LNG carrier will be equipped with NO96-GW technology, which allows an optimised boil-off rate for the LNG cargo.
The new LNG carrier will be owned and operated by Chandris.
Edited from press release by Callum O'Reilly
Read the article online at: https://www.lngindustry.com/lng-shipping/09092015/gtt-receives-lng-carrier-order-1260/
You might also like
FSRU Toscana terminal in operation until 2044
OLT Offshore LNG Toscana has announced that FSRU Toscana will be in operation until the end of 2044, as a result of the extension of the useful life of the terminal.