GTT receives LNG carrier tank design order from DSME
Published by Will Owen,
Editor
LNG Industry,
GTT has received an order from the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) concerning the tank design of a new 174 000 m3 LNG carrier on behalf of a European ship-owner.
GTT’s membrane containment system NO96 GW has been selected for the design of the tanks and the delivery of the ship is planned for early 2022.
Philippe Berterottière, Chairman and CEO of GTT, commented: “We are very pleased to continue our partnership of excellence with DSME with this new order.”
Read the article online at: https://www.lngindustry.com/lng-shipping/09012020/gtt-receives-lng-carrier-tank-design-order-from-dsme/
You might also like
EIA: US natural gas trade will continue to grow with the start-up of new LNG export projects
The U.S. Energy Information Administration’s recently released Short-Term Energy Outlook forecasts that US LNG exports will continue to lead growth in US natural gas trade as three LNG export projects currently under construction start operations and ramp up to full production by the end of 2025.