Skip to main content

MOL launches Indonesian coastal LNG shuttle transport project

Published by , Editor
LNG Industry,


Mitsui O.S.K. Lines (MOL) has released a statement claiming that it has joined forces with PT Pelindo Energi Logistik – a partner in Indonesia – to launch the joint operation of the Triputra LNG carrier, which has conducted the project’s initial discharging operation at the Port of Benoa, Bali Island.

The Triputra is 151.03 m long, and has a breadth of 28 m, a draft of 7.018 m and a cargo tank capacity of 23 014 m3. It was constructed in 2000, and was formerly known as the Surya Satsuma.

This is the second coastal shuttle transport project, and follows one serving for West Java, in which a vessel shuttle-transports LNG to the Port of Benoa, where it then discharges it to a floating storage unit (FSU).

The charterer, PEL, is aiming to develop a gas value chain using the method of transferring LNG from the FSU to the floating regasification unit (FRU), which is moored at the pier. Once the LNG has been regasified, it will be sent to a power plant in Bali.

Edited from press release by David Rowlands

Read the article online at: https://www.lngindustry.com/lng-shipping/06052016/mol-launches-indonesian-coastal-lng-shuttle-transport-project-2402/

You might also like

SEA-LNG releases new report

SEA-LNG has published a new report titled ‘The LNG Pathway: Mid-Year Market Review’ – evaluating the state of play for LNG, liquefied biomethane, and e-methane, as well as presenting initial analysis of why LNG dual-fuel engines offer the best returns under the IMO Net-Zero Framework.

 
 

Embed article link: (copy the HTML code below):