GTT awarded DSME LNG carrier tank design order
Published by Jessica Casey,
Editor
LNG Industry,
GTT will design the tanks of these three vessels, which will each offer a total cargo capacity of 174 000 m3 and will be fitted with the NO96 GW membrane containment system, developed by GTT.
The delivery of the vessels is scheduled between 1Q27 and 2Q27.
Read the article online at: https://www.lngindustry.com/lng-shipping/06042023/gtt-awarded-dsme-lng-carrier-tank-design-order/
You might also like
Sawgrass LNG & Power completes first LNG shore-to-ship bunkering operation at Port Everglades
Sawgrass LNG & Power has announced the completion of the first-ever shore-to-ship LNG bunkering operation at Port Everglades in Fort Lauderdale.