GTT receives tank design order from SHI
Published by David Rowlands,
Editor
LNG Industry,
According to the statement, the tanks of this unit will be fitted with the Mark III Flex+ membrane containment system developed by GTT, offering a guaranteed boil-off rate of 0.07% of tank volume/day. It is scheduled for delivery in 1Q21.
The Chairman and CEO of GTT, Philippe Berterottière, said: “We are very pleased of the renewed trust of our excellent partner Samsung Heavy Industries as well as welcome Minerva for its entry this year into the LNG industry. This order brings up to five the number of LNG carriers to be equipped with this new Mark III Flex+ technology.”
Read the article online at: https://www.lngindustry.com/lng-shipping/05122018/gtt-receives-tank-design-order-from-shi/
You might also like
JGC-Hyundai joint venture considered as EPC contractor for LNG project in Papua New Guinea
JGC Corp. and Hyundai Engineering & Construction Co., Ltd have been selected as the EPC contractor for a major low carbon LNG plant as part of the Papua LNG project planned by TotalEnergies and its venture partners in Papua New Guinea.