GTT receives tank design order from SHI
Published by David Rowlands,
Editor
LNG Industry,
According to the statement, the tanks of this unit will be fitted with the Mark III Flex+ membrane containment system developed by GTT, offering a guaranteed boil-off rate of 0.07% of tank volume/day. It is scheduled for delivery in 1Q21.
The Chairman and CEO of GTT, Philippe Berterottière, said: “We are very pleased of the renewed trust of our excellent partner Samsung Heavy Industries as well as welcome Minerva for its entry this year into the LNG industry. This order brings up to five the number of LNG carriers to be equipped with this new Mark III Flex+ technology.”
Read the article online at: https://www.lngindustry.com/lng-shipping/05122018/gtt-receives-tank-design-order-from-shi/
You might also like
IEEFA: EU combined gas and LNG imports fall due to reduced demand
EU measures to reduce gas demand have driven a decline in the bloc’s combined imports of pipeline gas and LNG, according to a new data tracking tool published by the Institute for Energy Economics and Financial Analysis.