GTT receives FSRU order
Published by David Rowlands,
Editor
LNG Industry,
Reuters has reported that Gaztransport & Technigaz (GTT) has received a new order for a floating storage and regasification unit (FSRU). The order has come from the South Korean shipbuilder, Samsung Heavy Industries.
Reuters confirms that the new vessel will feature Mark III technology, and is expected to be delivered by 2017. The Mark III membrane system is a cryogenic liner, which is supported directly by the inner hull of the vessel. It consists of a primary metallic membrane, which is placed above a prefabricated insulation panel and includes a secondary membrane.
Edited from various sources by David Rowlands
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/30102015/gtt-receives-fsru-order-1554/
You might also like
GTT to design onshore storage tank for liquefaction plant in China
GTT has received an order from Beijing Petrochemical Engineering Co., Ltd for the design of a 10 000 m3 onshore LNG tank to be built at the Yangjiawan LNG liquefaction plant in China.