Skip to main content

GTT receives LNG carrier tank order

Published by
LNG Industry,


GTT has received an order notification from a Korean shipyard for the tank design of a new 174 000 m3 LNG carrier, to be built on behalf of a European ship-owner.

The vessel’s delivery is expected in Q1 2021.

The LNG tanks of the vessel will be equipped with the proven Mark III Flex containment system developed by GTT.

The ship-owner’s and shipyard's names are confidential.

Read the article online at: https://www.lngindustry.com/liquid-natural-gas/27112018/gtt-receives-lng-carrier-tank-order/

You might also like

Kabel Schlepp

WEBINAR - Key criteria to ensure proper selection of a cable drag chain

In this webinar KabelSchlepp will review and discuss the items needed to ensure that a cable track is properly selected and sized for the user’s application. How diameters and weights of the fill package effect cable track selection and how the jacket material of the fill package influences the cable track design. Register for free today »

 
 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

LNG carrier news