Skip to main content

GTT receives LNG carrier tank order

Published by
LNG Industry,


GTT has received an order notification from a Korean shipyard for the tank design of a new 174 000 m3 LNG carrier, to be built on behalf of a European ship-owner.

The vessel’s delivery is expected in Q1 2021.

The LNG tanks of the vessel will be equipped with the proven Mark III Flex containment system developed by GTT.

The ship-owner’s and shipyard's names are confidential.

Read the article online at: https://www.lngindustry.com/liquid-natural-gas/27112018/gtt-receives-lng-carrier-tank-order/

You might also like

 InEight

[WEBINAR] Why Risk-Adjusted Project Forecasting Is Becoming the New Norm

This webinar will walk the audience through a methodology for developing risk-adjusted plans, leveraging remote collaboration techniques for disparate and socially distanced teams. This next-generation risk management approach is already proving itself on numerous oil and gas CAPEX projects. Find out why InEight expects the trend of risk-adjusted scheduling adoption to continue. Register for free today »

 

Polyisocyanurate vs. cellular glass

Johns Mansville looks at the differences between polyisocyanurate (PIR) and cellular glass insulations and discusses which one is better for LNG pipe insulation applications.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

LNG carrier news