GTT receives LNG carrier tank order
Published by Will Owen,
Editor
LNG Industry,
GTT has received an order notification from a Korean shipyard for the tank design of a new 174 000 m3 LNG carrier, to be built on behalf of a European ship-owner.
The vessel’s delivery is expected in Q1 2021.
The LNG tanks of the vessel will be equipped with the proven Mark III Flex containment system developed by GTT.
The ship-owner’s and shipyard's names are confidential.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/27112018/gtt-receives-lng-carrier-tank-order/
You might also like
Equinor provides update on gas leak at Melkøya
Equinor has announced that the gas leak that occurred at the Hammerfest LNG plant at Melkøya on 31 May 2023 has been stopped and normalisation is under way.