GTT receives LNG carrier tank order
Published by Will Owen,
Editor
LNG Industry,
GTT has received an order notification from a Korean shipyard for the tank design of a new 174 000 m3 LNG carrier, to be built on behalf of a European ship-owner.
The vessel’s delivery is expected in Q1 2021.
The LNG tanks of the vessel will be equipped with the proven Mark III Flex containment system developed by GTT.
The ship-owner’s and shipyard's names are confidential.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/27112018/gtt-receives-lng-carrier-tank-order/
You might also like
Port Canaveral completes bunkering for world’s largest cruise ship
Royal Caribbean International’s Star of the Seas has been refuelled with LNG for the first time at Port Canaveral.