GTT secures LNG tank order from SHI
Published by Will Owen,
Editor
LNG Industry,
GTT has received a new order from the Korean shipyard Samsung Heavy Industries (SHI), concerning the tank design of two 174 000 m3 LNGCs, on behalf of a European ship owner.
The LNG tanks of both units will be fitted with the Mark III Flex+ membrane containment system developed by GTT, offering a guaranteed boil-off rate of 0.07% of tank volume/day. The delivery of the vessels is planned during the second semester of 2020.
Philippe Berterottière, Chairman and CEO of GTT, declared: “We are proud of the confidence granted by SHI and the success encountered by our latest Mark III technology evolution.”
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/25092018/gtt-secures-lng-tank-order-from-shi/
You might also like
PV GAS transports LNG by train for first time
On 6 September 2024, Petrovietnam Gas Corp. held a ceremony to launch the first train carrying LNG from the south to the north.