Video: Development of Shell’s Prelude FLNG project
                            
                                
                                
                                        
                                            
                                        
                                
                                    
                                        Published by David Rowlands,
                                        Editor
                                        
                                    
                                LNG Industry,
                                
                            
                        
Nikkiso Cryo has released a video detailing the development of Shell’s floating LNG (FLNG) unit – Prelude. The design and development of the vessel took 18 million hr, with 14 months in construction. The video, which can be viewed below, includes footage of testing and construction, and includes words from some of the key workers on the project.
Edited from various sources by David Rowlands
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/25052016/video-development-of-shells-prelude-flng-project-2496/
You might also like
Daphne Technology and Maran Gas conclude methane abatement pilot
Daphne Technology and Maran Gas have concluded the first shipboard plasma-catalytic methane abatement pilot.
                                