Panamanian LNG tanker due to load in the Netherlands
Published by Will Owen,
Editor
LNG Industry,
According to Reuters shipping data, the LNG tanker Patris is due to arrive in Rotterdam in early September.
The 174 000 m3 capacity tanker is en route from Panama and will load a cargo at the Dutch port during its stay.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/24082018/panamanian-lng-tanker-due-to-load-in-the-netherlands/
You might also like
Crown LNG selects IKM Consulting Ltd as engineering design partner for Grangemouth LNG project
Crown LNG Holdings Ltd has selected IKM Engineering & Environmental Consultants as its partner for the design and engineering of its planned 100% owned floating LNG import terminal in the Firth of Forth, Scotland.