Skip to main content

DSME places LNG tank order with GTT

Published by
LNG Industry,


GTT has received an order from the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) regarding the tank design of two new 174 000 m3 LNG carriers on behalf of a European ship-owner.

GTT's membrane containment system NO96 GW has been selected for the design of the tanks. The delivery of the ships is planned for the first semester of 2021.

Philippe Berterottière, Chairman and CEO of GTT commented: “We are very pleased to continue our partnership with DSME with this new order.”

Read the article online at: https://www.lngindustry.com/liquid-natural-gas/24012019/dsme-places-lng-tank-order-with-gtt/

You might also like

Edge LNG signs agreement with large producer

Edge Gathering Virtual Pipelines 2 LLC has announced that it has been selected by a large producer to capture and liquefy gas from its stranded wells in Tioga County in the Marcellus basin.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

LNG carrier news