GTT receives order from DSME for LNG carrier tank design
Published by David Rowlands,
Editor
LNG Industry,
According to the statement, the unit will be constructed on behalf of a European shipowner.
GTT claims that the tanks will be fitted with the NO96 GW technology, and that the vessel is expected to be delivered by 1H21.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/23102018/gtt-receives-order-from-dsme-for-lng-carrier-tank-design/
You might also like
Technomak and Dixstone sign EPCCI agreement for Gabon LNG project
Technomak has announced the signing of an EPCCI agreement with Dixstone for Perenco’s Cap Lopez floating LNG project in Gabon.