GTT receives LNG tank order from CPECCNC
Published by Will Owen,
Editor
LNG Industry,
GTT has received an order from the EPC contractor, China Petroleum Engineering and Construction Corp. North China Company (CPECCNC), for the design of the containment system for a 29 000 m3 membrane full containment onshore tank intended for the Hejian LNG peak shaving plant.
GTT will design the membrane inner tank, which will be fitted with its GST® technology. The onshore storage tank will be located in Hejian City, in the Hebei Province in China, and is expected to be commissioned during 2H21.
David Colson, Commercial VP of GTT declared: “We are pleased to count CPECCNC among our partners and to contribute to the development of LNG infrastructure in China.”
Zhang Zhaoyang, Chief Engineer of CPECCNC, “We are pleased to collaborate with GTT on the membrane full containment LNG tank design, and proud to implement this innovative solution for the Chinese LNG peak shaving infrastructure in the Hebei province.”
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/22072020/gtt-receives-lng-tank-order-from-cpeccnc/
You might also like
Avenir LNG and Eni sign agreement for the multi-year charter
Avenir LNG Ltd has signed a time charter party with LNG Shipping S.p.A., a 100% subsidiary of Eni S.p.A., for one of the company’s 7500 m3 LNG bunker vessels, the Avenir Aspiration.