NASSCO christens new LNG-conversion-ready tanker
Published by David Rowlands,
Editor
LNG Industry,
The vessel is 610 ft long, 50 000 DWT, LNG-conversion-ready, and achieves 33% increased fuel efficiency through several features, including a G-series MAN ME slow-speed main engine and an optimised hull form. It is part of an eight-tanker programme for two customers.
Debora Denning, the wife of Tom Denning – the SEACOR Vice President – christened the vessel with the traditional break of a champagne bottle on the side of the vessel.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/21122016/nassco-christens-new-lng-conversion-ready-tanker/
You might also like
GULF and PTT Tank sign EPCC contract with POSCO E&C
Gulf Development Public Company Ltd and POSCO E&C, have signed an EPCC contract between Gulf MTP LNG Terminal Co. Ltd and PEC-CAZ consortium for the superstructure development of the Map Ta Phut industrial port phase 3 project.