Tellurian’s Driftwood LNG receives FEIS from FERC
Published by Will Owen,
Editor
LNG Industry,
Tellurian Inc. has announced that the US Federal Energy Regulatory Commission (FERC) has issued the final environmental impact statement (FEIS) for Driftwood LNG.
Driftwood is an approximately 27.6 million tpy LNG export facility and an associated 96 mile pipeline, proposed near Lake Charles, Louisiana, on the US Gulf Coast.
President and CEO Meg Gentle said, “Tellurian thanks the FERC for a thorough review and for remaining on schedule. We look forward to receiving the agency’s order granting authorisation to site, construct and operate our Driftwood project. Tellurian will then stand ready to make a final investment decision and begin construction in the first half of 2019, with the first LNG expected in 2023.”
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/21012019/tellurians-driftwood-lng-receives-feis-from-ferc/
You might also like
Measuring the LNG process with confidence
At every stage of the LNG process – from pretreatment to transportation – accurate and reliable measurements are essential for optimising production, maintaining safety, and ensuring profitability.