Donsötank orders two LNG-fuelled tankers
Published by David Rowlands,
Editor
LNG Industry,
According to the statement, the vessels will feature Wärtsilä 10V31 DF engines, and are scheduled for delivery in 2021.
The LNG-driven vessels are designed by FKAB, and are based on a low-resistance hull design. They are classified as ice class 1A ships, have an overall length of 167.7 m, draft of 9.2 m and a cargo capacity of 28 000 m3.
Both tankers will be commercially managed by Navix Maritime Chartering.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/20122018/donstank-orders-two-lng-fuelled-tankers/
You might also like
Delfin Midstream enters agreement with Siemens Energy to reserve gas turbine manufacturing capacity
Delfin Midstream Inc. has entered into an agreement with Siemens Energy Inc. to reserve manufacturing capacity for four SGT-750 gas turbine mechanical drive packages and an early works programme with Samsung Heavy Industries and Black & Veatch to further floating LNG vessel design specifications.