P&O cruise ship leaves Meyer Werft shipyard
Published by Will Owen,
Editor
LNG Industry,
The newbuild P&O cruise ship, IONA, has departed from the Meyer Werft shipyard in Papenburg.
The vessel was conveyed on the river Ems to Eemshaven (NL), assisted by two tugs. It is now due to go through several days of technical and nautical sea trials on the North Sea.
Iona is one of the world’s first ever LNG-powered cruise ships. The luxury liner will be able to accommodate up to 5200 passengers, measures 344.5 m long, and has a gross tonnage of 184 000 t.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/20032020/po-cruise-ship-leaves-meyer-werft-shipyard/
You might also like
RMK Marine begins work on LNG bunkering vessel
RMK Marine has celebrate the steel cutting ceremony for an LNG bunkering vessel commissioned by Sirius Shipping and Gasum.