P&O cruise ship leaves Meyer Werft shipyard
Published by Will Owen,
Editor
LNG Industry,
The newbuild P&O cruise ship, IONA, has departed from the Meyer Werft shipyard in Papenburg.
The vessel was conveyed on the river Ems to Eemshaven (NL), assisted by two tugs. It is now due to go through several days of technical and nautical sea trials on the North Sea.
Iona is one of the world’s first ever LNG-powered cruise ships. The luxury liner will be able to accommodate up to 5200 passengers, measures 344.5 m long, and has a gross tonnage of 184 000 t.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/20032020/po-cruise-ship-leaves-meyer-werft-shipyard/
You might also like
GAIL and Alpha Gas sign long-term charter party agreement for LNG carrier
GAIL (India) Ltd has entered into a long-term charter party agreement with Alpha Gas for the LNG carrier, Energy Fidelity.