Tank design order for a new LNG carrier
                            
                                
                                
                                        
                                            
                                        
                                
                                    
                                        Published by Lydia Woellwarth,
                                        Editor
                                        
                                    
                                LNG Industry,
                                
                            
                        
GTT announces that it has received an order from its partner the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) for the tank design of a new LNG carrier on behalf of an Asian shipowner.
As part of this order, GTT will provide the design and associated engineering services for the tanks of the vessel, which will offer a capacity of 174 000 m3. The tanks will be fitted with the GTT NO96 GW membrane containment system, a technology developed by GTT.
The vessel will be delivered in the second half of 2024.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/17112021/tank-design-order-for-a-new-lng-carrier/
You might also like
Daphne Technology and Maran Gas conclude methane abatement pilot
Daphne Technology and Maran Gas have concluded the first shipboard plasma-catalytic methane abatement pilot.