Skip to main content

FERC releases draft EIS for Rio Grande LNG project

Published by , Editor
LNG Industry,


US Federal Energy Regulatory Commission (FERC) staff have released the draft environmental impact statement (EIS) for the proposed Rio Grande LNG export terminal in Cameron County, Texas.

The draft EIS “concludes that construction and operation of the Rio Grande LNG Project would result in some adverse environmental impacts, but these impacts would be reduced to less than significant levels. However, the Rio Grande LNG Project, combined with other projects within the geographic scope, would result in certain significant cumulative impacts.”

Read the article online at: https://www.lngindustry.com/liquid-natural-gas/17102018/ferc-releases-draft-eis-for-rio-grande-lng-project/

You might also like


 

 The LNG Industry Podcast

A podcast series for professionals in the LNG industry featuring short, insightful interviews. Subscribe on your favourite podcast app to start listening today.

Apple Podcasts  Spotify Podcasts  YouTube

 

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

LNG project news US LNG news LNG export news Current LNG projects